Wednesday, June 16, 2010

Friday, June 11, 2010

Weekly Update 6/7-6/11

6/7
Today we were assigned to write a compilation of all of the mentor contacts over the course of the year and write a page or two about how much the mentors have done for us. I will be working on this and finishing it this week.

6/11
I completed the mentor contact assignment and handed it in.

Friday, June 4, 2010

Weekly Update 5/31-6/4

6/2
Today, I began working on my final exam. This exam requires students to construct a journal article summarizing their senior project.

6/4
I have completed the final exam journal article and am handing it in today.

Tuesday, May 18, 2010

Weekly Update 5/18-5/20

5/18
Today, my partner and I mounted each of our posters to the presentation board.

5/20
Today is the infamous balmy night. Presentations will be held in building 77 and both I am my partner are thoroughly prepared.

Monday, May 3, 2010

Weekly Update 5/3-5/7

5/3
This week I will be starting and completing my poster for the balmy night in May.

5/7
I have nearly finished my poster. I will continue to work over the weekend and complete it early next week.

Monday, April 26, 2010

Weekly Update 4/26-4/30

4/26
Today, I BBSed the class the template that Ms. Green sent to me for the presentation board. I also completed two portions of the template myself. This week, I have to collect images of my finished product to display on the presentation board.

4/30
This week I have spent working on the presentation board. I have completed the majority of the assignment and plan on finishing the whole thing over the course of next week.

Tuesday, April 20, 2010

Weekly Update 4/19-4/23

4/20
Yesterday I began my new materials checklist for Ms. Green. The groups in the future would need an example of what people have done in the past for this assignment, so they were not so in the dark as we were. I will complete this over the span of this week.

4/23
Over the course of this week, I have completed the new materials checklist for Ms. Green. We have also obtained the presentation board template from Ms. Green for the balmy night in May. I have begun my work on finishing the template, so that I may begin to assemble my presentation board.

Wednesday, March 24, 2010

Weekly Update 3/22-3/24

3/22
Yesterday, my partner and I worked on improving the air supply. We successfully managed to upgrade the system by adjusting the nozzle and the vinyl tubing. This new and better system allows us to effectively move the cue ball and skantly manuever the baseball.

3/24
Morning:
"You ask, what is our policy? I say it is to wage war by land, sea, and air. War with all our might and with all the strength God has given us, and to wage war against a monstrous tyranny never surpassed in the dark and lamentable catalogue of human crime. That is our policy.

You ask, what is our aim? I can answer in one word. It is victory. Victory at all costs - Victory in spite of all terrors - Victory, however long and hard the road may be, for without victory there is no survival.

Let that be realized. No survival for the [Technology DARE], no survival for all that the [Technology DARE] has stood for, no survival for the urge, the impulse of the ages, that mankind shall move forward toward his goal.

I take up my task in buoyancy and hope. I feel sure that our cause will not be suffered to fail among men. I feel entitled at this juncture, at this time, to claim the aid of all and to say, "Come then, let us go forward together with our united strength."
-Anthony Fischer, "Blood, Sweat, and Tears"- 3/24/2010

Afternoon:
"If there is anyone out there who still doubts that [the TSA] is a place where all things are possible; who still wonders if the dream of our founders is alive in our time; who still questions the power of our democracy, [today] is your answer.

It's the answer told by lines that stretched around schools and churches in numbers this nation has never seen; by people who waited three hours and four hours, many for the very first time in their lives, because they believed that this time must be different; that their voice could be that difference.

It's the answer that led those who have been told for so long by so many to be cynical, and fearful, and doubtful of what we can achieve to put their hands on the arc of history and bend it once more toward the hope of a better day.

It's been a long time coming, but tonight, because of what we did on this day, in this [victory], at this defining moment, change has come to [The Marine Academy].

I just received a very gracious call from [the High Tech participants]. [They] fought long and hard in this campaign, and [they have] fought even longer and harder for the [association they love]. [They have] endured sacrifices for [the TSA] that most of us cannot begin to imagine, and we are better off for the service rendered by [these] brave and selfless [leaders]. I congratulate [them] for all they have achieved, and I look forward to working with them to renew this [association's] promise in the months ahead.

I want to thank my partner in this journey, a man who campaigned from his heart and spoke for the men and women he grew up with on the streets of Scranton and rode with on that train home to Delaware, the vice-president [of the Marine Academy's Technology DARE Team, Sam Judkis].

But above all, I will never forget who this victory truly belongs to — it belongs to you.

I was never the likeliest [victor] for this [competition]. We didn't start with much money or many endorsements. Our campaign was not hatched in the halls of Washington — it began in the backyards of Des Moines and the living rooms of Concord and the front porches of Charleston.

It was built by working men and women who dug into what little savings they had to give $5 and $10 and $20 to this cause. It grew strength from the young people who rejected the myth of their generation's apathy; who left their homes and their families for jobs that offered little pay and less sleep; from the not-so-young people who braved the bitter cold and scorching heat to knock on the doors of perfect strangers; from the millions of Americans who volunteered and organized, and proved that more than two centuries later, a government of the people, by the people and for the people has not perished from this earth. This is your victory.

For that is the true genius of [the TSA] — that [the TSA] can change. Our union can be perfected. And what we have already achieved gives us hope for what we can and must achieve tomorrow.

[The TSA], we have come so far. We have seen so much. But there is so much more to do. So tonight, let us ask ourselves: If our children should live to see the next century; if my daughters should be so lucky to live as long as Ann Nixon Cooper, what change will they see? What progress will we have made?

This is our chance to answer that call. This is our moment. This is our time — to put our people back to work and open doors of opportunity for our kids; to restore prosperity and promote the cause of peace; to reclaim the [TSA] Dream and reaffirm that fundamental truth that out of many, we are one; that while we breathe, we hope, and where we are met with cynicism, and doubt, and those who tell us that we can't, we will respond with that timeless creed that sums up the spirit of a people: Yes, we [did]."
-Anthony Fischer, "Yes We [Did]"- 3/24/2010

Monday, March 15, 2010

Weekly Update 3/15- 3/19

3/15
Over the weekend, my mentor and I finished my servo and nozzle apparatus. The servo has gotten a massive overhaul and is now considerably more customized than it was before. The nozzle was also changed. Images of the changes will be uploaded onto my blog in the "Construction Progress" section. Also, I worked in the Media Center today on my script for my presentations which I just learned are tomorrow. I will, however, be giving my presentation on Wednesday.

Preliminary Design


Figure 1: Designing Bellows (Esque) Foot Pump


Figure 2: Cutting Wood For the Pump


Figure 3: Adjusting the Drill Press


Figure 4: Utilizing Drill Press to Alter Pump


Figure 5: Back View of Preliminary Servo and Nozzle Design


Figure 6: Preliminary Servo and Nozzle Apparatus Design

Friday, March 12, 2010

Weekly Update 3/8- 3/12

3/8
Today we could not work on our design. Instead we took a saftey tour so that we could take the safety test tomorrow.

3/12
Today we attached the hinges to my partner's pump. After several failed attempts (the boards were repeatedly uneven due to their angular cuts), we finally found a method that works and screwed them in. We also tested the CPR mask piece to see if it could withstand 30 PSI. It passed.

Friday, March 5, 2010

Weekly Update 3/1- 3/5

3/1
Thursday and Friday were spent at home, due to the snow day. We are going to have to step up the progress this week to make up for lost time.

3/5
Today I presented once more. I redid my presentation from last marking period for a new grade, since I did not do so well last time. I believe I did considerably better this time around.

Tuesday, February 23, 2010

Weekly Update 2/22-2/26

2/23
Today, I made contact with the director of the Technology DARE, Mr. Caldwell. I asked whether or not my customized security camera servo would be acceptable for the competition. Mr. Caldwell acknowledged the customizations and said that it should be fine given the amount of improvements and innovations from the pre-fabricated servo.

Tuesday, February 16, 2010

Weekly Update 2/16- 2/19

2/16
Today, I worked on updating my blog by adding all of the necessary images to each of my posts. My partner's part of the project has not been completed, so we cannot start a few of the things we have planned for the week. However, more improvements have been made to the servo, and such positive actions will be perpetuated, as I plan on taking the servo home every day to tweak it.

2/17
My instructors say that I am finished with my bid process, as I have already purchased all of my components.

Friday, February 12, 2010

Weekly Update 2/8- 2/12

2/8
A mostly finished product has been assembled for the servo. Today, we tested it in the systems lab. We hope to continue to experiment and improve it over the next week. This week will be all about the servo and arena setup.

2/12
This week was not dedicated to the servo unfortunately. The weather kept us from school Wednesday and Thursday. Also, on friday, most people were absent because of the school closings in Middletown. This is a setback, but I believe we will be fine with a recovery effort.

Friday, February 5, 2010

Weekly Update 2/1-2/5

2/1
Between today and tomorrow, I must complete a detailed schedule to accompany my conquest to complete the Technology DARE. Hopefully, this system will help me to make due dates on time.

2/5
All of the necessary components have been purchased and assembled. All of the pieces fit together properly, and photographic documentation supports it. Today, I will be meeting with my mentor about my servo.

Nozzle Apparatus


Figure 1: Nozzle Apparatus

Regulator


Figure 1: Regulator

Full Port Ball Valve


Figure 1: Full Port Ball Valve

Check Valve


Figure 1: Check Valve

Friday, January 29, 2010

Weekly Update 1/25-1/29

1/25
This week I am to collect all of the pieces needed for my nozzle apparatus and control panel for the final product. My partner and I have comprised a list of necessary components, and I must visit Grainger to pick them up.

1/29
The third marking period has started, and therefore the construction phase of the project must be undertaken. My mentor and I have been working on my servo, and hope to finish it within the coming weeks. Also, I have begun to gather all the necessary components for my nozzle apparatus.

Wednesday, January 27, 2010

STEMM Report

Introduction
Practical Application of Concept
Sonic (critical flow venturi) nozzles have been used by some organizations as calibration standards for the accuracy testing of gas meters and have sometimes been used as flow transfer standards in inter-laboratory comparisons, but their routine application has been limited, possibly due to the lack of practical guidelines. “The implementation of ISO 9300: 1990 ‘Measurement of gas flow by means of critical flow venturi nozzles’ is discussed in relation to the practical application of flow-calibrated nozzles.” (Sciencedirect.com). Working equations applicable to meter accuracy testing are presented. The high level of repeatability of sonic nozzles has been demonstrated by nozzle inter-comparison work using a “‘Wheastone bridge’ technique in this laboratory and at the Australian National Measurement Laboratory.” (Sciencedirect.com). Considerations in the practical application of the bridge technique are presented in relation to nozzles used for gas meter testing.
Also, if by happenstance, a crazed gunman placed the barrel of a .45 to my head and demanded that I demonstrate the use of critical thinking skills to select appropriate applications of energy and power, to select appropriate materials and fabrication of a solution, and to demonstrate the application of a solution by way of manufacturing a nozzle system to connect to a pump to move a motley crew of spheres into an objective, I would be aptly prepared to meet his or her somewhat irrational insistences.
Design Solution Description (image here)
Figure 1:












The Technology DARE has multiple components that are used in conjunction to serve as a system. My particular portion of the project is to complete the nozzle and control panel. The nozzle (as featured in Figure 1) is comprised of two different pieces adjoined to provide a fixed adapter that will lead to the output nozzle. The clear tubing will connect to my partner’s portion of the project, but more specifically the storage tank. The full port ball valve will act as a shut off valve to control airflow from the storage tank and to regulate pressure build up. The brass hose barbs and the brass output hose barb adapter will connect the valves and nozzle (respectively) to the tubing. The servo will be attached to the nozzle apparatus and will serve as the method of aiming the nozzle. The wireless controller will control this servo and the directions it turns. Lastly, the nozzle is featured at the end of the system and will release the output of the airflow.
Image of most recent solution
Figure 2:


Systems Engineering
Invention/Innovation
The nozzle apparatus as well as the control system each fall under the category of innovation. The Technology DARE rules dictate that the system and each of its components must be student made. However, though the literal translation supplies no leeway in interpretation, this commandment has been circumvented by the participants along with the judges, as there is simply no feasible way for a student to have access to the proper equipment fabricate the correct mechanisms. Instead, it is understood that students may adapt preexisting pieces of related objects into making their own machinations.
Type of System/Part of System
Personally, my objective is to complete two major components to attach to my partner’s portion and thereby successfully complete a system.
Involved Engineering Fields
Hydrodynamic, Electrical, and Mechanical engineering are each evident within the Technology DARE event. The transfer and manipulation of fluids (i.e. air) is the single most important factor of the project, as it is considered the driving force of the system. The control panel allows the hydrodynamic portion of the system to accurately and competently complete the objectives laid out before us through the application of circuitry and wireless commanding. Mechanical engineering binds hydrodynamic and electrical engineering together by fluidly and efficiently combining the two to make a complete system.
Necessary Manufacturing
Lean Manufacturing is an operational strategy oriented toward achieving the shortest possible cycle time by eliminating waste. The benefits generally are lower costs, higher quality, and shorter lead times. The term "lean manufacturing" is coined to represent half the human effort in the company, half the manufacturing space, half the investment in tools, and half the engineering hours to develop a new product in half the time.
Manufacturing Category Label
Electronics, Engineering, industrial design, and Metalworking are all manufacturing categories that charade as important factors in the production and design of the Technology DARE event. Electronics apply to the wireless control panel I am designing and producing. Engineering is evident in any project that requires the application of problem solving through fabrication of a system. Industrial design is more loosely apparent in the Technology as compared to the other category labels. Industrial designers are basically conceptual engineers, which I would consider myself to have been initially (more prominently, that is) and continue to be throughout the design process. Without a competent background, I essentially was forced to design a theoretic model, and then test it, now I must do the same for a control panel. Metalworking can be found in the fabrication and application of custom metal pieces in a format of my own design.

Applicable Science Concepts
Project Related Concept/Principle/Law and Creditor
Bernoulli’s Principle physical principle formulated by Daniel Bernoulli that states that as the speed of a moving fluid (liquid or gas) increases, the pressure within the fluid decreases. The phenomenon described by Bernoulli's principle has many practical applications; it is employed in the carburetor and the atomizer, in which air is the moving fluid, and in the aspirator, in which water is the moving fluid. In the first two devices air moving through a tube passes through a constriction, which causes an increase in speed and a corresponding reduction in pressure. As a result, liquid is forced up into the air stream (through a narrow tube that leads from the body of the liquid to the constriction) by the greater atmospheric pressure on the surface of the liquid. In the aspirator air is drawn into a stream of water as the water flows through a constriction. Bernoulli's principle can be explained in terms of the law of conservation of energy. As a fluid moves from a wider pipe into a narrower pipe or a constriction, a corresponding volume must move a greater distance forward in the narrower pipe and thus have a greater speed. At the same time, the work done by corresponding volumes in the wider and narrower pipes will be expressed by the product of the pressure and the volume. Since the speed is greater in the narrower pipe, the kinetic energy of that volume is greater. Then, by the law of conservation of energy, this increase in kinetic energy must be balanced by a decrease in the pressure-volume product, or, since the volumes are equal, by a decrease in pressure.
Examples In Explanation of Design

Figure 3: Flowmeters (http://www.lmnoeng.com/Flow/bernoulli.htm) Used for determining the change in static pressure in a pipe due to a diameter change, determining flowrate, or designing a flow meter.

Involved Technology
Applied Technology Description
The brass hose barb is an essential piece to the system. It acts as a connector, linking the hose to and from each of the different valves. Without it, there would be no way to attach the valves seamlessly to the system.


Figure 4: Brass Hose Barb (http://images.orgill.com/200x200/5476155.jpg) Used to connect tubing to different valves.

The brass output hose barb adapter is very similar to the brass hose barb. In fact, it is identical in every way except that its function is slightly different. Contrary to the attachment method on the regular brass hose barb (simply by screwing it into one of the valves), the brass output hose barb adapter has the attachments screwed into it. In this case, it will serve as the attachment point for the nozzle, and the input area will serve as a containment section for flowing air.


Figure 5: Brass Output Hose Barb Adapter (http://images.orgill.com/200x200/2902781.jpg) Used to connect tubing to nozzle output.

The clear tubing allows the continuation of airflow throughout the system. It connects to the storage tank and carries the air to each of the barbs, and subsequently the valves, and stops only at the brass output hose barb adapter, which leads to the output nozzle.


Figure 6: Clear Tubing (http://specialtech.co.uk/spshop/files/detail/xspctube.jpg) Used to perpetuate airflow throughout system.

The full port ball valve allows the control of airflow through the tubing. It is a shut off valve that cuts off airflow from the storage container, permitting pressure build up.


Figure 7: Full Port Ball Valve (http://common1.csnimages.com/lf/1/hash/938/672272/1/1%2F4%22+Full+Port+Ball+Valve.jpg) Used to shut off airflow through the tube to allow pressure build up in the holding tank.

The wireless controller will serve as the control method for the servo directing the nozzle in the system. As the name would indicate, this will allow the user to direct the airflow without being in direct contact with the servo. This will have to be wired and programmed properly to interact with the servo.


Figure 8: Wireless Controller (http://superdroidrobots.com/images/TE-033-006.jpg) Used to wirelessly control the servo attached to the nozzle

The servo is the mechanism that will be controlling the motion of the nozzle in the system. Wirelessly connected to the wireless remote, it can be adroitly maneuvered by the user. The servo is comprised of a rotating gear that would turn the nozzle left and right.


Figure 9: Servo (http://www.bluemelon.org/images/0/02/Servo.gif) Used to mechanically move nozzle through wireless controller.

The pressure washer nozzle is the output for the airflow generated by the system. It will be attached to the brass output hose barb adapter to allow it access to the air in the tubing. This will be the last and final portion of the system located on the very end of the design.


Figure 10: Pressure Washer Nozzle (http://www.malcleanse.info/images/04_Rotating_200_BarTurbo_Nozzle_ART25172040.jpg) Used to expel the airflow generated by the system to complete the objective.

Mathematical Computations
Identification of Mathematical Theory for Conceptual Explanation


Q= Flowrate
V= Pipe Velocity
V2= Throat Velocity
P2-P1= Pressure Difference
Z2-Z1= Elevation Difference
D= Pipe Diameter
D2= Throat Diameter
A= Pipe Area
A2= Throat Area
If calculated properly, this equation will allow me to discern the flowrate, pipe velocity, throat velocity, pipe area, and throat area. Utilizing the known variables of pressure distance, pipe diameter, and throat diameter, I can discover the variables previously listed. Meanwhile, elevation difference is disregarded, as it is unnecessary in this application of the equation.
Formulas and Calculations


Figure 10: Equation (http://www.lmnoeng.com/Flow/bernoulli.htm) Bernoulli’s Principle

Unfortunately, I cannot complete this equation for the time being. I need the variables from my partner’s portion of the project to be found before I can begin my own. However, here is a sample of how the equation would work:

0= 100-70 + V22+V12
30*9.8 2*9.8

-100-70 = V22+V12
-30*9.8 2*9.8

-3332= V22+V12
-30*9.8

11 1/3= V22+V12

Conclusion
Design, Engineering, and Manufacturing Synopsis and Final Design Solution Summary
Designing the nozzle took a turn for the worse when we were finally able to use the compressed air tank. Shortly thereafter, to progress this series of unfortunate events, the piece I had intended to use as my main factor in my nozzle did not comply with the design. Meeting with a mentor, we discussed the benefits of a new design, the brass output hose barb adapter attached to a pressure washer nozzle. By taking this new attribute and fusing it with the rest of my designs, I was able to simulate an engineer’s standpoint, innovating a design to complete an assigned objective. To take the engineering concept further, I determined that I could use Lean Manufacturing to produce the system as a readily available product on the market.
Reiteration of Significant Technology, Science, and Math Elements
Bernoulli’s Principle physical principle formulated by Daniel Bernoulli that states that as the speed of a moving fluid (liquid or gas) increases, the pressure within the fluid decreases. This was the leading scientific concept that I derived my calculations from. The mathematics involved in the project were dictated by the Bernoulli Principle’s equation.
Conclusion
In conclusion, the Technology DARE is just ridden with mathematics, science, and engineering. Though the project itself has no immediate purpose (other than a grade), the applications in real life are actually evident. By being able to solve a problem with engineering, it allows one to demonstrate and hone critical thinking skills.

Tuesday, January 19, 2010

Weekly Update 1/19

1/19
I am now preparing for my formal progress update. I have learned that I will be presenting on Friday. I must now update my blog with the appropriate images.

Friday, January 15, 2010

Developmental Work

Final Design AutoCAD Drawings:

Figure 1: Final Nozzle Design, Exploded View (displays how the nozzle apparatus is assembled)









Figure 2: Final Nozzle Design, Isometric View (displays the nozzle apparatus connected)

Figure 3: Final Nozzle Design, Orthographic View (displays a top front and side view with labeled dimensions)
Supply List:
Supply List
Item Description QTY Size Remarks
1 Dry Wall Screws 23 1”, 1 5/8”, 2” Fasten components to wooden structure
2 Metal Bracket 3 1” Organize wires
3 2”x4” Wood 1 2”x4”x6’ Structural support of nozzle and servo
4 Plywood 1 2’x1”x2’ Base for nozzle mount
Figure 4: Supply List (all the consumables that will be used within the design)

Tools and Equipment List:
Tools and Equipment List
Item Description Use
1 Wire Cutters Cut wires
2 Scissors Cut tubing
3 Clamps Fasten servo apparatus to the arena
4 Chop Saw Make angular cuts on wood and short straight cuts
5 Table Saw Make long straight cuts on wood
6 Jigsaw Make curved cuts on wood
7 Drill Screw in screws
Figure 5: Tools and Equipment List (all the tools and equipment required to assemble and adjust the materials and supplies)
Materials List:
Materials List
Item Description QTY Size Remarks
1 Rubber Air Gun Tip (Westward No. 2ZYD6) 1 ¼” Input/ 1/8” Output used to expel the airflow generated by the system
2 Automotive Choke Cables 1 Used to control servo
3 Hose Barb Adapter (Watts No. A-197226) 1 ¼” Input/ ¼” Output will serve as the attachment point for the nozzle
4 Brass Hose Barb (Watts) 4 ¼” Input/ ¼” Output acts as a connector, linking the hose to and from each of the different valves
5 Wireless Controller 1 will be controlling the motion of the nozzle in the system
6 Full Port Ball Valve (Husky) 1 ¼” allows the control of airflow through the tubing
7 Clear Tubing 1 ¼” Diameter used to perpetuate airflow throughout system
8
Servo 1 used to mechanically move nozzle through wireless controller

Figure 7: Clear Tubing Figure 8: Brass Hose Barb
(http://specialtech.co.uk/spshop/files/detail/xspctube.jpg) (http://images.orgill.com/200x200/2902781.jpg)





Figure 9: Full Port Ball Valve (http://common1.csnimages.com/lf/1/hash/938/672272/1/1%2F4%22+Full+Port+Ball+Valve.jpg)

Figure 10: Regulator
(http://www.northerntool.com/images/product/images/4519303_lg.jpg)





Figure 11: Hose Barb Adapter
(http://images.orgill.com/200x200/2902781.jpg)





Figure 12: Pressure Washer Nozzle
(http://www.malcleanse.info/images/04_Rotating_200_BarTurbo_Nozzle_ART25172040.jpg)








Figure 13: Metal Bracket Figure 14: Wireless Controller
(http://img.tradeindia.com/fp/0/186/707.jpg) (http://superdroidrobots.com/images/TE-033-006.jpg)





Figure 15: Automotive Choke Cables Figure 16: Servo (http://www.haigh.com.au/images/ (http://www.bluemelon.org/images/0/02/Servo.gif)
ProductImages/CC60.jpg)


Plan of Procedure:
1) The first segment of clear tubing will connect to my partner’s portion of the project, but more specifically the storage tank.


2) The other end of the first segment of clear tubing will connect to the input brass hose barb on full port ball valve
+ +




3) Another brass hose barb will screw into the discharge side of the full port ball valve

+
4) The second segment of clear tubing will be attached to the output brass hose barb on the full port ball valve

+ +
5) The other end of the second segment of clear tubing will be attached to the input brass hose barb on the regulator

+ +
6) The third segment of clear tubing will connect to the output brass hose barb on the other end of the regulator

+ +


7) The other end of the third segment of clear tubing will connect to input hose barb adapter





8) The hose barb adapter will have the pressure washer nozzle screwed into it (completing the nozzle apparatus)

+
9) The nozzle apparatus will be attached to the servo, via a metal bracket, and will serve as the method of aiming the nozzle
+ + +

10) The automotive choke cables will serve as initial controls for the servo

+

11) If the automotive choke cables do not function properly, then a wireless system and controller will be implemented instead

Weekly Update 1/12-1/15

1/12
Yesterday, I worked all period and for twenty minutes after school on my STEMM report for the science, technology, and math involved in my project. I handed it in at the end of the day.

1/15
I have readjusted my drawings and handed them in. I had to make changes after learning that my original concept was not entirely feasible (thanks to my new possible mentor contact at Granger).

Friday, January 8, 2010

Weekly Update 1/5-1/8

1/5
On suggestion from my instructors, I began to search through a Granger catalog. Through this catalog, I hope to find the parts I need for my design. Though, I see I have to adjust my drawings in accordance to the parts I find.

1/8
Yesterday, I visited Granger and met a possible new mentor contact. The chief engineer and salesman at Granger personally helped me for over an hour on my design. I purchased several new parts that will change my design. I must update my drawings.